System Installation & activation

Active Solar installation with racking system


Our certified installation team handles the physical setup of your solar system. This includes mounting the solar panels on your roof or ground mount, installing the inverters, and setting up the monitoring system. Our average installation period is typically two days. One day for installation and the second to ensure we leave a clean worksite and light system testing.

Once the system is installed, we coordinate with local utilities (typically FPL for our Sarasota and Charlotte County homeowners) and local government agencies in your county to get approval for activation. We then switch on your solar system!

What make us different from others

Our vision is to provide high-quality, cost-effective renewable energy products that will assist you in eliminating your electric bill and taking control of your own power generation.

  • Dot
    No Subcontractors, in-house Install team
  • Dot
    30 year warranties for (roof, electrical, structure, and panel performance)
  • Dot
    No re-installation costs for re-roofs (avg $8,000 cost)
  • Dot
    24/7 System Monitoring
  • Dot
    Complimentary Annual Cleanings
Your FREE Solar Savings Report Here